Title: NANC%20Report%20%20Numbering%20Oversight%20Working%20Group%20(NOWG)
1NANC Report Numbering Oversight Working
Group(NOWG)
- January 19, 2005
- Co-Chairs
- Rosemary Emmer, Nextel
- Karen Riepenkroger, Sprint
2Contents
- PA Change Order Recommendations for
- 31, 32, 33, 34, 37
- Status New PA Technical Requirements
- Status of NANPA and PA 2004 Performance Surveys
- NOWG Jan-Feb 2005 Meeting Schedule
3PA Change Order Recommendation
- Change Order 31 dated September 17, 2004
- SP Enhancement Expand Query Options for
Donation Report - This change order 31 proposes that PAS be
modified to provide an additional query options
for the Donation Report. The only query option
currently available is by NPA and gives the
information from all of the OCNs listed on the
User Profile of the SP requesting the
information. - The NOWG believes that this change order benefits
the industry in giving SPs a way to further
define the search criteria. The SPs would be
able to obtain only the specific information
related to their OCN(s) rather than getting
everything in an NPA and having to re-sort to
find their information. - The NOWG recommends that Change Order 31 be
implemented at the same time as Change Orders 32
and 33.
4PA Change Order Recommendation
- Change Order 32 dated September 17, 2004
- SP Enhancement Modify Process for Deleting PAS
Work Items - This change order 32 proposes that PAS be
modified to provide additional options for
deleting work items from an SPs inbox. The
current method is one item at a time. - The NOWG believes that this change order benefits
the industry in giving SPs a way to delete items
from their PAS inbox in multiples instead of the
current one at a time which is quite time
consuming for carriers heavily involved in
pooling. - The NOWG recommends that Change Order 32 be
implemented at the same time as Change Orders 31
and 33.
5PA Change Order Recommendation
- Change Order 33 dated September 30, 2004
- SP Enhancement Modify Search Forms/View Form
query - This change order 33 proposes that PAS be
modified to enable service providers to view only
the forms that are related to a specified
thousands-block when specifying the NPA-NXX-X as
the search criteria. In addition, a new
NPA-NXX-X column will be added to the Search
Forms/View Form query results screen. - The NOWG believes that this change order benefits
the industry by having the NPA-NXX-X on the
Search Forms/View Forms query. As it is today
when you specify a particular NPA-NXX-X to query,
PAS generates everything that was submitted on
the same PAS Tracking Number. (SP is looking for
a particular NPA-NXX-X in a submission that was
for a 4 block request. The PAS report generated
is for all 4 blocks with no indication which is
which. See Sample Report) - The NOWG recommends that Change Order 33 be
implemented at the same time as Change Orders 31
and 32.
6PA Change Order Recommendation
- Change Order 34 dated September 30, 2004
- SP Enhancement Modify Part 1A Report
- This change order 34 proposes that PAS be
modified to add a column on the Part 1A Report
entitled Part 3 Effective Date - The originator of this request was attempting to
find a way to determine when the Part 4 would be
due for block assignments. Since the Part 1A
report is the only report currently available to
SPs in PAS, this was an attempt to secure all of
the information in one place. Note The
originator withdrew their request. - The NOWG believes that the purpose of this change
order will be better served with a Part 4 report
that was proposed in change order 25. Change
order 25 was not recommended for approval by the
NOWG due to the fact that the PA had not built-in
enough flexibility in the search functionality
used to create SP reports. - The NOWG suggests that the PA should create a new
change order (incorporating NOWG recommendations
from 25 and 34) for a Part 4 report that lists
not only the LERG effective date, but also the
date the Part 4 is due for each block assignment.
The report should also indicate if the Part 4
has been received or not. (Indication could be
as simple as the date the Part 4 was received and
this field should be blank if the Part 4 has not
yet been received by the PA.) - Based on the above, the NOWG does not recommend
that this change order (34) be approved.
7PA Change Order Recommendation
- Change Order 37 dated December 7, 2004
- INC Issue 458 Reduce Aging Period for
Returned/Reclaimed Blocks - This change order 37 proposes changes to PAS to
reduce the aging period on returned/reclaimed
blocks from 90 days to 45 days. There are no
changes in scope of the PA responsibilities, just
system changes to various timers in PAS - The resolution to INC Issue 458 will require a
programming change to system timers in PAS. The
NOWG supports this change order because the
industry will benefit if blocks are available for
(re)assignment sooner rather than later.
8Status New PA Technical Requirements
- Reviewing PA Technical Requirements for suggested
changes Completed - Identified sections for modification and
- upgrade Completed
- Recommendation to the NANC/FCC for consideration
at the March 15, 2005 meeting In Progress
9Status NANPA and PA 2004 Performance Surveys
- The NANPA and PA draft surveys were circulated
for comment on November 1st. Proposed changes
were discussed and appropriate upgrades were
made. The surveys are now in final draft status. - Once the NANC approves the final draft, we will
initiate the performance evaluation process. The
evaluation schedule is attached.
10NANPA/PA Evaluation Schedule
Month Activity
January 2005 January 19th NANC - Receive survey and cover letter approval and permission to initiate Performance Evaluation process Surveys Posted to Number Administrators web sites on January 24, 2005 Surveys distributed by Number Administrators via email exploder list
February 2005 Tally of surveys numeric and written responses by NOWG
March 2005 Survey Responses Due Back to NOWG Co-chairs by March 4, 2005 March 15th - Progress update to NANC Operational Review Meeting with NANPA in Sterling, VA (March 16 - 17)
April 2004 Operational Review Meeting with PA in Concord, CA (April 12 - 14)
May 2005 May 2nd - 5th - NOWG face-to-face meeting in Denver, CO May 17th - Progress update to NANC
June 2005 Week of the 27th - NOWG meets separately with the FCC, the NANPA and the PA to share preliminary survey results in Washington DC
July 2005 July 19th NANC - NOWG presents final performance reports on NANPA and PA
High Level Timeline January 19th NANC - NANC/FCC endorses PA survey for distribution Other January activity - Survey Distribution February - Survey results tallied by NOWG March - NOWG Analysis of Survey input, Ops review in Sterling, VA April - Ops review in Concord, CA
11NOWG Jan - Feb 2005 Meeting Schedule
Thursday, January 27 200 pm ET 2 hrs
Tuesday, February 8 100pm ET 2 hrs
Thursday, February 24 200pm ET 2 hours
Contact either of the Co-Chairs for complete
meeting or conference call details Rosemary.Emmer_at_
nextel.com or Karen.S.Riepenkroger_at_mail.sprint.com
(Other meetings for the NOWG may be scheduled as
needed beyond what has been identified in this
list) NOWG meeting notes and documents are posted
at nanc-chair.org