Change Order # 31 dated September 17, 2004 ... could be as simple as the date the Part 4 was received and this ... Change Order # 37 dated December 7, 2004 ... – PowerPoint PPT presentation

Number of Views:65
Avg rating:3.0/5.0
Slides: 12
Provided by: KarenMu6
Category:

less

Transcript and Presenter's Notes

Title: NANC%20Report%20%20Numbering%20Oversight%20Working%20Group%20(NOWG)


1
NANC Report Numbering Oversight Working
Group(NOWG)
  • January 19, 2005
  • Co-Chairs
  • Rosemary Emmer, Nextel
  • Karen Riepenkroger, Sprint

2
Contents
  • PA Change Order Recommendations for
  • 31, 32, 33, 34, 37
  • Status New PA Technical Requirements
  • Status of NANPA and PA 2004 Performance Surveys
  • NOWG Jan-Feb 2005 Meeting Schedule

3
PA Change Order Recommendation
  • Change Order 31 dated September 17, 2004
  • SP Enhancement Expand Query Options for
    Donation Report
  • This change order 31 proposes that PAS be
    modified to provide an additional query options
    for the Donation Report. The only query option
    currently available is by NPA and gives the
    information from all of the OCNs listed on the
    User Profile of the SP requesting the
    information.
  • The NOWG believes that this change order benefits
    the industry in giving SPs a way to further
    define the search criteria. The SPs would be
    able to obtain only the specific information
    related to their OCN(s) rather than getting
    everything in an NPA and having to re-sort to
    find their information. 
  • The NOWG recommends that Change Order 31 be
    implemented at the same time as Change Orders 32
    and 33.

4
PA Change Order Recommendation
  • Change Order 32 dated September 17, 2004
  • SP Enhancement Modify Process for Deleting PAS
    Work Items
  • This change order 32 proposes that PAS be
    modified to provide additional options for
    deleting work items from an SPs inbox. The
    current method is one item at a time.
  • The NOWG believes that this change order benefits
    the industry in giving SPs a way to delete items
    from their PAS inbox in multiples instead of the
    current one at a time which is quite time
    consuming for carriers heavily involved in
    pooling. 
  • The NOWG recommends that Change Order 32 be
    implemented at the same time as Change Orders 31
    and 33.

5
PA Change Order Recommendation
  • Change Order 33 dated September 30, 2004
  • SP Enhancement Modify Search Forms/View Form
    query
  • This change order 33 proposes that PAS be
    modified to enable service providers to view only
    the forms that are related to a specified
    thousands-block when specifying the NPA-NXX-X as
    the search criteria. In addition, a new
    NPA-NXX-X column will be added to the Search
    Forms/View Form query results screen.
  • The NOWG believes that this change order benefits
    the industry by having the NPA-NXX-X on the
    Search Forms/View Forms query. As it is today
    when you specify a particular NPA-NXX-X to query,
    PAS generates everything that was submitted on
    the same PAS Tracking Number. (SP is looking for
    a particular NPA-NXX-X in a submission that was
    for a 4 block request. The PAS report generated
    is for all 4 blocks with no indication which is
    which. See Sample Report) 
  • The NOWG recommends that Change Order 33 be
    implemented at the same time as Change Orders 31
    and 32.

6
PA Change Order Recommendation
  • Change Order 34 dated September 30, 2004
  • SP Enhancement Modify Part 1A Report
  • This change order 34 proposes that PAS be
    modified to add a column on the Part 1A Report
    entitled Part 3 Effective Date
  • The originator of this request was attempting to
    find a way to determine when the Part 4 would be
    due for block assignments. Since the Part 1A
    report is the only report currently available to
    SPs in PAS, this was an attempt to secure all of
    the information in one place. Note The
    originator withdrew their request. 
  • The NOWG believes that the purpose of this change
    order will be better served with a Part 4 report
    that was proposed in change order 25. Change
    order 25 was not recommended for approval by the
    NOWG due to the fact that the PA had not built-in
    enough flexibility in the search functionality
    used to create SP reports.
  • The NOWG suggests that the PA should create a new
    change order (incorporating NOWG recommendations
    from 25 and 34) for a Part 4 report that lists
    not only the LERG effective date, but also the
    date the Part 4 is due for each block assignment.
    The report should also indicate if the Part 4
    has been received or not. (Indication could be
    as simple as the date the Part 4 was received and
    this field should be blank if the Part 4 has not
    yet been received by the PA.) 
  • Based on the above, the NOWG does not recommend
    that this change order (34) be approved.

7
PA Change Order Recommendation
  • Change Order 37 dated December 7, 2004
  • INC Issue 458 Reduce Aging Period for
    Returned/Reclaimed Blocks
  • This change order 37 proposes changes to PAS to
    reduce the aging period on returned/reclaimed
    blocks from 90 days to 45 days. There are no
    changes in scope of the PA responsibilities, just
    system changes to various timers in PAS
  • The resolution to INC Issue 458 will require a
    programming change to system timers in PAS.  The
    NOWG supports this change order because the
    industry will benefit if blocks are available for
    (re)assignment sooner rather than later.

8
Status New PA Technical Requirements
  • Reviewing PA Technical Requirements for suggested
    changes Completed
  • Identified sections for modification and
  • upgrade Completed
  • Recommendation to the NANC/FCC for consideration
    at the March 15, 2005 meeting In Progress

9
Status NANPA and PA 2004 Performance Surveys
  • The NANPA and PA draft surveys were circulated
    for comment on November 1st. Proposed changes
    were discussed and appropriate upgrades were
    made. The surveys are now in final draft status.
  • Once the NANC approves the final draft, we will
    initiate the performance evaluation process. The
    evaluation schedule is attached.

10
NANPA/PA Evaluation Schedule
Month Activity
January 2005 January 19th NANC - Receive survey and cover letter approval and permission to initiate Performance Evaluation process Surveys Posted to Number Administrators web sites on January 24, 2005 Surveys distributed by Number Administrators via email exploder list
February 2005 Tally of surveys numeric and written responses by NOWG
March 2005 Survey Responses Due Back to NOWG Co-chairs by March 4, 2005 March 15th - Progress update to NANC Operational Review Meeting with NANPA in Sterling, VA (March 16 - 17)
April 2004 Operational Review Meeting with PA in Concord, CA (April 12 - 14)
May 2005 May 2nd - 5th - NOWG face-to-face meeting in Denver, CO May 17th - Progress update to NANC
June 2005 Week of the 27th - NOWG meets separately with the FCC, the NANPA and the PA to share preliminary survey results in Washington DC
July 2005 July 19th NANC - NOWG presents final performance reports on NANPA and PA
High Level Timeline January 19th NANC - NANC/FCC endorses PA survey for distribution Other January activity - Survey Distribution February - Survey results tallied by NOWG March - NOWG Analysis of Survey input, Ops review in Sterling, VA April - Ops review in Concord, CA
11
NOWG Jan - Feb 2005 Meeting Schedule
 
Thursday, January 27 200 pm ET 2 hrs
Tuesday, February 8 100pm ET 2 hrs
Thursday, February 24 200pm ET 2 hours
Contact either of the Co-Chairs for complete
meeting or conference call details Rosemary.Emmer_at_
nextel.com or Karen.S.Riepenkroger_at_mail.sprint.com
(Other meetings for the NOWG may be scheduled as
needed beyond what has been identified in this
list) NOWG meeting notes and documents are posted
at nanc-chair.org