If globalization is inevitable, how do we use the built environment to help steer it into becoming a - PowerPoint PPT Presentation

1 / 144
About This Presentation
Title:

If globalization is inevitable, how do we use the built environment to help steer it into becoming a

Description:

If globalization is inevitable, how do we use the built environment to help steer it into becoming a – PowerPoint PPT presentation

Number of Views:76
Avg rating:3.0/5.0
Slides: 145
Provided by: brian354
Category:

less

Transcript and Presenter's Notes

Title: If globalization is inevitable, how do we use the built environment to help steer it into becoming a


1

2
(No Transcript)
3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
If globalization is inevitable, how do we use the
built environment to help steer it into becoming
a more sustainable world?
16
Systems thinking places emphasis on finding a
procedure that enables understanding of the
relationships between and amongst diverse sets of
information.
17
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
18
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
19
The quad grid method of spatial subdivision is a
widely accepted procedure for understanding large
spatial data sets.
20
The GIS mapping technique known as quad grid
analysis produces 3280 hits when entered into the
GoogleTM search engine on the World Wide Web.
21
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
22
Each human (each brain) seeks that level (or
scale) at which a limit (boundary) of
understanding (useful information) can occur.
23
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
24
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
25
Conservation of resources although important only
forestalls the inevitable. At CMPBS we are
actively working on and demonstrating procedures
that balance the sourcing to the re-sourcing
winthin the life cycle of resource use.
26
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
27
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
28
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
29
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
30
Pixelation could be a graphic representation of
an idealized state the place where hierarchy and
democracy meet centralized purpose and
decentralized determination becoming cooperative
and adaptive simultaneously.
31
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
32
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
33

Pixel representation of the world is everywhere
in this present human dominated ecosystem the
trend seems unstoppable. Either we accept this
inevitability or we have means of successfully
changing it. CMPBS has chosen to accept
pixelation by coordinating it with geographic
information systems, spatial planning and design.
34
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
GRAY WORLD
35
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
PLATE CARRE EQUAL PROJECTION 204 162 682 ACRES
PER GRID CELL.
U.S.S FOOTPRINT NEEDS
INTERNAL CAPACITY
17.8 cells
13.1 cells
DEFICIT
SOURCE LIVING PLANET REPORT
36
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
PLATE CARRE EQUAL PROJECTION 204 162 682 ACRES
PER GRID CELL.
CHINAS FOOTPRINT NEEDS
INTERNAL CAPACITY
8.9 cells
DEFICIT
12 cells
SOURCE LIVING PLANET REPORT
Source Sharing natures interest
37
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
PLATE CARRE EQUAL PROJECTION 204 162 682 ACRES
PER GRID CELL.
EUROPES FOOTPRINT NEEDS
INTERNAL CAPACITY
10.5 cells
DEFICIT
10.5 cells
SOURCE LIVING PLANET REPORT
Source Sharing natures interest
38
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
PLATE CARRE EQUAL PROJECTION 204 162 682 ACRES
PER GRID CELL.
MEXICOS FOOTPRINT NEEDS
INTERNAL CAPACITY
1.3 cells
DEFICIT
DEFICIT
1.4 cells
SOURCE LIVING PLANET REPORT
39
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
PLATE CARRE EQUAL PROJECTION 204 162 682 ACRES
PER GRID CELL.
JAPANS FOOTPRINT NEEDS
INTERNAL CAPACITY
1 cells
DEFICIT
5.3 cells
SOURCE LIVING PLANET REPORT
Source Sharing natures interest
40
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
PLATE CARRE EQUAL PROJECTION 204 162 682 ACRES
PER GRID CELL.
WORLDS FOOTPRINT NEEDS
INTERNAL CAPACITY
648 cells
DEFICIT
142 cells
SOURCE LIVING PLANET REPORT
Source Sharing natures interest
41
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
HUMAN FOOTPRINT
U.S. AVERAGE FOOTPRINT 23.7 ACRES / CAP
WORLD AVERAGE FOOTPRINT 5.4 ACRES / CAP
AFGHANI FOOTPRINT 1.1 ACRES / CAP
SOURCE LIVING PLANET REPORT
42
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
US ECOLOGICAL OVERSHOOT 75
SOURCE LIVING PLANET REPORT
43
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
EARTHS ECOLOGICAL OVERSHOOT 22
SOURCE LIVING PLANET REPORT
44
We fool ourselves into believing that we can
disregard ecological limits indefinitely. We
actively resist the idea that there are
biophysical limits and shield ourselves with
wealth from the fallout of ecological overshoot.
Sharing Natures Interest
45
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
GRAY WORLD
46
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
47
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
USA IMBALANCE
AIR (CO2)
ENERGY
- 20.1 (5 imbalanced)
- Renewable,19.7 (5 imbalanced)
- Ground recharge, 0.17
WATER
MATERIALS
- Recycled, 15.7 (7 imbalanced)
- Surface, 0.18 (588 imbalanced)
Spatial
Numeric
48
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
TEXAS IMBALANCE
AIR (CO2)
ENERGY
- 8.8 (11.4 imbalanced)
- Renewable,142 (0.7 imbalanced)
- Ground recharge, 1.67
WATER
MATERIALS
- N/A
- Surface, 0.62 (160 imbalanced)
Spatial
Numeric
49
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
50
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
AUSTIN IMBALANCE
AIR (CO2)
ENERGY
- 62 tree cover drop
- Renewable, 25 (4 imbalanced)
- 56 worse
WATER
MATERIALS
- Solid waste, 14 wose
Numeric
51
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
52
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
53
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
54
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
55
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
GRAY WORLD
56
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
57
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
58
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
59
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
60
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
GREEN WORLD
61
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
62
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
63
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
64
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
65
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
66
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
67
(No Transcript)
68
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
LAND PLANNING
69
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
RE-SOURCE
SOURCE
5000 sqft (FOREST)
AIR
7500 sqft (FOREST)
500 sqft (HARVEST)
400 sqft (FOREST TREATMENT)
WATER
500 sqft (RAISED BED GARDEN)
500 sqft (RAISED BED GARDEN)
FOOD
ENERGY
600 sqft (PASSIVE SOLAR)
600 sqft (THERMAL MASS)
3 acres (STRAW)
MAT.
600 sqft (STRAW BALE BUILDING)
LIFE CYCLE UPSTREAM AND DOWNSTREAM SUMMARIZED
AREA NEEDED PER PERSON
70
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
AIR SOURCE
AIR CAPACITY
..................................................
...201 persons
.....................52 persons
HOLDING CAPACITY (NON-INTEGRATED)
71
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
AIR RE-SOURCE
AIR CAPACITY
..................................................
...201 persons
.....................52 persons
HOLDING CAPACITY (NON-INTEGRATED)
72
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
WATER SOURCE
AIR CAPACITY
..................................................
...201 persons
WATER CAPACITY
..................................................
74 persons
.....................52 persons
HOLDING CAPACITY (NON-INTEGRATED)
73
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
WATER RE-SOURCE
AIR CAPACITY
..................................................
...201 persons
WATER CAPACITY
..................................................
74 persons
.....................52 persons
HOLDING CAPACITY (NON-INTEGRATED)
74
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
FOOD SOURCE
AIR CAPACITY
..................................................
...201 persons
WATER CAPACITY
..................................................
74 persons
FOOD CAPACITY
..................................................
.254 persons
.....................52 persons
HOLDING CAPACITY (NON-INTEGRATED)
75
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
FOOD RE-SOURCE
AIR CAPACITY
..................................................
...201 persons
WATER CAPACITY
..................................................
74 persons
FOOD CAPACITY
..................................................
.254 persons
.....................52 persons
HOLDING CAPACITY (NON-INTEGRATED)
76
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
ENERGY SOURCE
AIR CAPACITY
..................................................
...201 persons
WATER CAPACITY
..................................................
74 persons
FOOD CAPACITY
..................................................
.254 persons
ENERGY CAPACITY
..............................................747
persons
.....................52 persons
HOLDING CAPACITY (NON-INTEGRATED)
77
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
ENERGY RE-SOURCE
AIR CAPACITY
..................................................
...201 persons
WATER CAPACITY
..................................................
74 persons
FOOD CAPACITY
..................................................
.254 persons
ENERGY CAPACITY
..............................................747
persons
.....................52 persons
HOLDING CAPACITY (NON-INTEGRATED)
78
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
MATERIAL SOURCE
AIR CAPACITY
..................................................
...201 persons
WATER CAPACITY
..................................................
74 persons
FOOD CAPACITY
..................................................
.254 persons
ENERGY CAPACITY
..............................................747
persons
...............................................4
persons
MATERIALS CAPACITY
.....................52 persons
HOLDING CAPACITY (NON-INTEGRATED)
79
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
MATERIAL RE-SOURCE
AIR CAPACITY
..................................................
...201 persons
WATER CAPACITY
..................................................
74 persons
FOOD CAPACITY
..................................................
.254 persons
ENERGY CAPACITY
..............................................747
persons
..............................................4
persons
MATERIALS CAPACITY
.....................52 persons
HOLDING CAPACITY (NON-INTEGRATED)
80
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
HOME SCALE
81
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
AIR SOURCE
82
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
AIR RE-SOURCE
83
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
AIR SOURCE RE-SOURCE
84
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
WATER SOURCE RE-SOURCE
85
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
FOOD SOURCE RESOURCE
86
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
ENERGY SOURCE RE-SOURCE
SOURCE CALCULATION INCLUDES CHARGE FOR ELECTRIC
VEHICLE TRANSPORTATION
87
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
MATERIAL SOURCE RE-SOURCE
88
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
ADVANCED GREEN DEMONSTRATION BUILDING
89
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
ADVANCED GREEN DEMONSTRATION BUILDING
90
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
ADVANCED GREEN DEMONSTRATION BUILDING
91
Resources are of three types (1) Land (area)
resources (2) People (point) resources (3)
Network resources (material, energy, food and
information)
92
USE
TRANSFORM
SOURCE
REBAR NETWORK
TRANSPORTATION
REBAR POINT
93
USE
TRANSFORM
SOURCE
FLYASH NETWORK
TRANSPORTATION
FLYASH POINT
94
USE
TRANSFORM
SOURCE
STRAW NETWORK
TRANSPORTATION
STRAW POINT
95
USE
TRANSFORM
SOURCE
WATER NETWORK
TRANSPORTATION
WATER POINT
96
(No Transcript)
97
(No Transcript)
98
(No Transcript)
99
(No Transcript)
100
(No Transcript)
101
(No Transcript)
102
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
103
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
104
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
LAREDO BLUEPRINT FARM
105
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
LAREDO BLUEPRINT FARM
106
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
LAREDO BLUEPRINT FARM
107
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
LAREDO BLUEPRINT FARM
108
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
LAREDO BLUEPRINT FARM
109
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
LAREDO BLUEPRINT FARM
110
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
111
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
112
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
113
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
114
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
115
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
116
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
117
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
118
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
119
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
120
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
121
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
122
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
123
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
124
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
125
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
DENMARK COMPETITION
126
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
GREENBELT AS CONNECTION
DONE BY OLIVIER MISISCHI FABIEN PROUVOST
127
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
MATRIX ICON AS PLANNING TOOLS
128
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
TRANSFORMATIVE DESIGN PROCESS
129
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
RED ENERGY AXIS AS EMMISIONS
130
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
GREENBELT AS ABSORPTIONS
131
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
BALANCE OF MULTIPLE BOUNDARIES
132
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
133
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
134
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
135
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
136
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
137
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
138
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
139
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
140
THE CENTER FOR MAXIMUM POTENTIAL BUILDING SYSTEMS
141
I have followed the Centers work in appropriate
technology for a number of yearsIn my opinion,
these topics and methodologies ought to be part
of architectural educational curricula
worldwide.   Donald Watson, FAIA
142
I have gone over your various research and
development projects and find them lucid,
intelligent, economic and in every way
gratifying.   R. Buckminster Fuller
143
Using their new software, The Center for
Maximum Potential Building Systems sets out to
build a detailed account of our material world.
The Centers house of data could be the
greatest infrastructural feat human beings have
ever accomplished.   Andrea Moed Metropolis
Magazine December 1996
144
Of all the environmental designers who studied
at the feet of Ian Mcharg, FASLA, at the
University of Pennsylvania, Pliny Fisk is
probably the most eclectic, the most radical, and
the most inventive. He is also, arguably, the
one whose ideas have the widest practical
application to the sustainable practice of
landscape design.   J. William Thompson,
FASLA Editor, Landscape Architecture July 2000
Write a Comment
User Comments (0)
About PowerShow.com