FPD Motivation Andrew Brandt UTA - PowerPoint PPT Presentation

About This Presentation
Title:

FPD Motivation Andrew Brandt UTA

Description:

Gap studies barely started on jet Z analysis (Tamsin) ... FPD info in DST's and Thumbnails. Pressure to Produce. Need results to justify use of bandwidth ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 8
Provided by: andrewg78
Learn more at: http://www-hep.uta.edu
Category:

less

Transcript and Presenter's Notes

Title: FPD Motivation Andrew Brandt UTA


1
FPD Motivation Andrew BrandtUTA
2
Unprecedented Data Samples
  • Gap studies barely started on jet Z analysis
    (Tamsin)
  • Huge data samples on tape in these and other
    areas
  • J/?, W, b, photon
  • How about diffractive top?
  • Glueballs?
  • What are we waiting for????
  • Added bonus
  • It turns out that last several months data has
    working dipole detector (Mike)
  • After shutdown Full FPD
  • Need your help to get physics results out!!!

3
Alas Missing Software (as of Beaune)
  • FPD_Reco Integration D0Reco
  • Trigger Simulator Raw Data
  • Forward Vertexing L3 Offline
  • L3 Geometry Offline
  • DST TMB Info D0reco
  • FPD_Analyze Offline (DSTTMB)
  • Alignment Tool (offline) Elastic stream
  • Calibration Tool (offline) LMB Data
  • L2 Gap Tool

4
Incomplete Software
  • L3 Single Interaction Tools
  • FPD Examine
  • Automatic Pot Motion Software
  • Event Display
  • Database
  • FPD analysis
  • Gap analysis

5
Goals for 2003 (from Feb.)
  • Data taking with integrated Phase I
  • Add FPD triggers to global list
  • Complete funding and implementation of Phase II
  • Preliminary results on several physics topics
  • Would like to produce a detailed list in all
    areas detector, software, PID, physics

6
Steps Needed for Physics
  • Partial list of steps needed to get to physics
  • quality data
  • Commission AFEs
  • Include trigger scintillator information/
  • basic and/or terms
  • Alignment of FPD
  • FPD database
  • Activate FPD_Reco
  • Halo understanding, reduction, and rejection
  • FPD info in DSTs and Thumbnails

7
Pressure to Produce
  • Need results to justify use of bandwidth
  • Luminosity is going up (along with halo)
  • FPD window is limited (quadrupoles out in 2006)
  • New orbits at some point may lower acceptance
  • Many new CDF results
Write a Comment
User Comments (0)
About PowerShow.com