Work Shop 2: CAPTURE - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Work Shop 2: CAPTURE

Description:

Work Shop 2: CAPTURE NEW INSTALLATIONS. French-Norwegian Seminar on ... French-Norwegain CCS Seminar Workshop 2- Capture:: new installations ... – PowerPoint PPT presentation

Number of Views:57
Avg rating:3.0/5.0
Slides: 13
Provided by: staalesel
Category:

less

Transcript and Presenter's Notes

Title: Work Shop 2: CAPTURE


1
Work Shop 2 CAPTURE NEW INSTALLATIONS
  • French-Norwegian Seminar on
  • Carbon Capture and Storage (CCS)

Pascale Morin and Nils A. Røkke Oslo, 22-23
November 2007
2
Workshops
  • 5 workshops
  • WS 1 Capture upgrades and retrofit
    installations
  • WS 2 Capture new installations
  • WS 3 Storage site selection and qualification
  • WS 4 Storage site operation and management
  • WS 5 Physico-chemical aspects of CO2 in capture,
    transport and storage
  • 3 sessions
  • Session 1 22/11 1015-1245 2hrs 30 min
  • Session 2 22/11 1630-1810 1hrs 40 min
  • Session 3 23/11 830-1030 2 hrs

3
Objectives
  • Seminar objectives
  • To provide an area for discussion and exchanges
    between the participants
  • To favor the emergence of public and private
    cooperation
  • To develop collaborative projects between France
    and Norway in the field of CCS
  • Workshop objectives
  • To identify the needs of the industry and
    institutes
  • To analyze, prioritize and validate the needs
  • To analyze ways to address needs and competences
    to be mobilized
  • To elaborate at least one collaboration which
    could be launched
  • To target co-operation between all parties
    (universities, institutes, government, industry)
  • Specific WS2 Scope
  • Identify industrys need within the CO2 capture
    and transport
  • Simplified gap analysis
  • Think-tank for new initiatives

4
Workshops Organization
  • Participation by invitation
  • Limited number of selected participants
  • Max 20 / workshop
  • Balance between Norwegian and French companies
    and research institutes
  • Ph. D. students (5 NO, 5 FR)
  • Competency and Value adding
  • 1 Moderator 1 Animator
  • gt participants have to attend the 3 sessions of
    the same workshop

5
Participants WS 2
Moderator/Animator
6
WS 2 Preparations before the seminar
  • Ongoing activities, needs seen, project ideas (1
    slide, use template)
  • Collect other input as you see fit (up to you)
  • Company profile (1-2 pages, use template)
  • Read Guidelines for the workshops
  • Check mandate with your superiors
  • Check e-mails and web-site http//www.france.no/C
    O2/welcome.html
  • Send ideas to animator/moderator (up to you)

7
Slide to be prepared by each participant in
advance
  • On going actions relative to the topics of the
    workshop
  • Action 1 Where / what / with who .
  • Action 2 Where / what / with who .
  • ..
  • Needs regarding the topics of the workshop
  • Studies about ..
  • Pilot demonstration about .
  • Operational projects about
  • Ideas regarding projects to be launched
  • .

8
Moderator and Animator roles
  • Moderator
  • Taking care of the schedule and a correct
    progress in the discussions
  • Taking notes to prepare the reports to the
    plenary sessions
  • Managing the interventions of the participants
  • Animator
  • Animating the discussions
  • Asking questions to the audience in order to
    cover all aspects of the topics
  • Summarizing and wrapping up the discussions

9
WS 1st session
  • Objectives
  • To identify the needs of the industry
  • To analyze, prioritize and validate the needs
  • Introduction by moderator/animator
  • Overview of the WSs theme
  • Participants briefly
  • Introduce themselves
  • Expectations
  • On going own activities
  • Needs and topics
  • Ideas gt share RD collaborations
  • ..
  • Report at the end of the day (in Plenary 3 at
    18.15 19.00)
  • Intermediate report from the WS

10
WS 2nd session
  • Objective
  • To address the needs identified
  • Discussions
  • How those needs could be addressed ?
  • What is missing to solve those points ?
  • Who have competences to tackle the problems ?
  • When those points should be addressed ?
  • What are the show-stoppers, constraints,
    difficulties ?
  • .
  • Report at the end of the day (in Plenary 3 at
    18.15 19.00)
  • Ways to address the identified needs
  • Required competences

11
WS 3rd session
  • Objectives
  • Wrap up the discussions
  • Elaborate potential projects on at least one or 2
    needs (as appropriate)
  • Discuss potential framework, organization,
    funding (as appropriate)
  • Discuss potential follow up actions
  • Conclusions gt final plenary session
  • The WS will give approx 10 minutes presentation

12
Final Plenary session
  • Sum-up of the WS discussions (10 minutes per WS)
  • The next steps ?
  • Learning points and take aways
  • General discussion
  • Concluding remarks
  • http//www.france.no/CO2/welcome.html
Write a Comment
User Comments (0)
About PowerShow.com