ITC, Inter TSO Compensation mechanism
  • TCMF 22 June 2006

2
Why we need to join
  • National Grid is required to comply with the
    Regulations
  • Regulation 1228/2003 allows for binding
    guidelines dealing with a number of issues
  • Tariff Harmonisation
  • Congestion management
  • ITC scheme
  • ERGEG recently consulted on guidelines for an ITC
    scheme
  • National Grid is required to join ITC when
    guidelines become active
  • Proposed implementation date 1 January 2007

3
The proposed scheme
  • Three elements
  • Costs
  • Existing costs vs LRAIC
  • Infrastructure
  • IMICA
  • Losses
  • WWT

4
Infrastructure principles
  • Improved ETSO scheme
  • Compensation cost reflective - MWkm impact
  • more accurate contributions
  • Removing payment for causing loop flows
  • Sensitivity factors for each combination
  • E.g. France to Portugal effect on Spain
  • Compensation based on reference exchanges
  • Compensation and contribution calculated
    simultaneously
  • Minimum of 72 snapshots

5
Losses principles
  • Based on with without transits
  • Compensation
  • Calculate losses with transit
  • Calculate losses without transit
  • Multiply difference by a reference price
  • Calculated in isolation
  • Based on a minimum of 72 snapshots
  • Contribution
  • Based on metered imports and exports
  • Socialised centrally calculated

6
Review charging methodology
  • Required to take account of regulation in
    charges for network access
  • Consistency with ITC principles
  • Currently
  • Interconnector Owners charged on same basis as
    generators and suppliers
  • Under ITC scheme
  • ITC provides compensation for transits
  • Need to review GB charges for transit
  • Not all imports and exports lead to transits

7
Initial proposal
  • Adjust the TNUoS charge for interconnected
    parties
  • Establish transit
  • Based on average hourly flow
  • Subtract from chargeable TEC
  • Subtract from chargeable demand
  • Additional rules for more than 2 interconnectors
  • CISG comment on proposals

8
Issues
  • Rules for sharing transit
  • How to manage January to March
  • When to consult (ERGEG next meeting 5 Oct)
  • Not enough certainty to consult prior to this
  • European commission comitology