Description:

Location: sector 3 in the IP4 area ... install the 2 ceramic beam pipes the magnet stands: January, 2001. magnet manufacturing: March -- mid of June, 2001 ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 9
Provided by: TedDa7
Category:

less

Transcript and Presenter's Notes

Title: RHIC Spin Flipper Status Mei Bai Brookhaven National Laboratory


1
RHIC Spin Flipper StatusMei BaiBrookhaven
National Laboratory
  • Feb. 21, 2001

2
  • RHIC spin flipper
  • magnet consists of two coil,
  • each has 7 turns. The two
  • coils can be either in series
  • for the spin flipper or in parallel
  • for beam dynamics studies
  • magnet length 1.15m
  • magnet assembly weight 120 lb
  • Location sector 3 in the IP4 area
  • spin flipper is cable of flipping the
  • spin of the beam in one ring without
  • disturbing the other
  • with 100 G-m field, the spin can
  • be flipped in about 2.5 seconds
  • Feb. 21, 2001

3
  • RHIC spin flipper circuit
  • Feb. 21, 2001

4
  • Status

magnet installation of the two ceramic beam pipes
and the magnet support structure are in
process. both magnets will be manufactured by an
outside company. The quoted delivery time is 14
weeks. power supply transmission lines were
ordered. cables will be pulled during the
shutdown. look for alternatives while we are
waiting for testing the powertron power
supplies. capacitor hunting is progressing control
s chassis and a power PC were ordered use
existing module to generate the low level driving
signal design of power supply control is in
progress use digital scope for magnet data
acquisition
  • Feb. 21, 2001

5
  • Schedule
  • magnet
  • install the 2 ceramic beam pipes the magnet
    stands January, 2001
  • magnet manufacturing March -- mid of June,
    2001
  • magnet measurement and testing end of June,
    2001
  • install in the RHIC ring end of June
  • power supply circuit ready for system
    testing before June
  • purchase the capacitors 8 weeks delivery
  • purchase the power supplies 8 weeks delivery
  • control system ready for system testing
    before June
  • hardware chassis, power PC, PLC
  • software FEC GUI application
  • system testing end of June

6
  • RHIC AC dipoles

RHIC Spin flipper
IP4
Sector 3
Sector 4
7
  • RHIC AC Dipole Installation

Horizontal
Vertical
8
  • Magnet Assembly

Cooling Water
Type A coil
Type B coil
Power Leads
Cooling Water