Water Services National Training Group and National Federation of Group Water Schemes - PowerPoint PPT Presentation

1 / 37
About This Presentation
Title:

Water Services National Training Group and National Federation of Group Water Schemes

Description:

Water Services National Training Group and National Federation of Group Water Schemes – PowerPoint PPT presentation

Number of Views:99
Avg rating:3.0/5.0
Slides: 38
Provided by: colm156
Category:

less

Transcript and Presenter's Notes

Title: Water Services National Training Group and National Federation of Group Water Schemes


1
Water Services National Training Group and
National Federation of Group Water Schemes
  • 7th Annual Rural Water Services Conference
  • 18th September 2008

2
Septic Tank Effluent Drainage System STEDS
(Update) Jim McGuire Senior Engineer North
Tipperary County Council
3
  • Background
  • Project description
  • Current status
  • Experience /Identified Issues

4
Alternative wastewater treatment systems for
small rural communities
  • The Challenge
  • Sustainability
  • Ease of Maintenance
  • Robust performance
  • Process performance
  • Low energy costs
  • Low operating costs

5
Approach
  • Literature search
  • Short list of options
  • Real life applications
  • Pilot Project

6
PROJECT TEAM
  • Treatment System Orenco, USA
  • Consulting Engineers Nicholas ODwyer Partners
  • Contractor EPS, Mallow, Co. Cork
  • Client North Tiperary County Council
  • Water Services National Training Group
  • Funding providing by Department of Environment
    ,
  • Heritage and Local Government

7
STEDS Components
  • Fibreglass Tank in each Garden
  • Primary treatment in interceptor tanks
  • 1000- or 1500-gallon tank per residence
  • 70 removal of fats, oils, and greases
  • 24-hour emergency storage
  • 12-year pumpout with 95 confidence
  • Abuses stay in interceptor tank
  • Chemical sources easier to identify

8
(No Transcript)
9
Components, cont.
  • Pump vault
  • High-head effluent pump
  • Filter cartridge
  • Float assembly
  • Discharge assembly

10
60mm Ø main
43mm Ø service
11
(No Transcript)
12
Collection System
  • Shallow burial depth
  • Laid to contour of land
  • No minimum velocities
  • No oversized designs
  • Low operation and maintenance costs

13
Secondary Treatment
  • Packed bed filter
  • Engineered textile material
  • Complete, premanufactured package
  • Operates in an unsaturated condition (not
    submerged)
  • Uses filtration and biological/chemical reduction

14
Advantex Unit
15
Advantages
  • Flexible in design
  • Adaptable to varying site conditions
  • Allows for phased development, modular
  • Can be integrated into existing sewer
    infrastructure?
  • Can be integrated into existing treatment system
  • Design includes storage/reserve in the event of
    power outages or need to repair mainline break
  • Low-impact construction
  • Minimal disruption to community

16
Advantages
  • Cost-effectiveness
  • Low initial costs?
  • No manholes
  • No pumping stations
  • Low operating costs
  • Low maintenance costs
  • Low and gradual repair/replacement costs

17
Benefits
  • May allow the construction of houses in areas
    where standard sewers or septic tank systems
    cannot be used
  • Has affordable installation costs and low
    maintenance costs
  • Has little visual impact

18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
Experience
  • 1. Retrofit Challenge
  • No rain water can enter system
  • No ground water can enter system

22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
25
Experience
  • 2. Sampling Challenge
  • Low flows pose particular challenges
  • Various arrangements tried

26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
Householders Play an Important Role
31
Experience
  • 3. Householders Role
  • No bleaches
  • No discharges from water softeners
  • No under sink macerators
  • Minimise phosphates in detergents

32
COSTS
  • 29 Houses served
  • Cost outturn not finalised (850,000 excl. VAT)
  • Includes range of non typical items

33
Non typical costs
  • Overseas manufacture / Shipping
  • Retrofit project
  • Reconfiguration of existing connections
  • Ground conditions
  • Telemetry/data capture
  • Sampling/monitoring
  • Additional connections
  • Additional single unit treatment system

34
Alternative wastewater treatment systems for
small rural communities
  • The Challenge
  • Sustainability
  • Ease of Maintenance
  • Robust performance
  • Process performance
  • Low energy costs
  • Low operating costs

35
Conclusions
  • Retrofit/rainwater challenges overcome
  • Sampling challenges resolved
  • Operating procedures improved
  • Final judgement awaited
  • Further Close monitoring
  • Performance is positive
  • Phosphates

36
  • End

37
Water Services National Training Group and
National Federation of Group Water Schemes
  • 7th Annual Rural Water Services Conference
  • 18th September 2008
Write a Comment
User Comments (0)
About PowerShow.com