Chimney Fires - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Chimney Fires

Description:

Chimney/Roof Crew. Use Plastic bags with DC to put out fire. Use Booster line to ... Before use DC up stack communicate with personnel on roof/chimney ... – PowerPoint PPT presentation

Number of Views:2645
Avg rating:3.0/5.0
Slides: 15
Provided by: DayR8
Category:
Tags: chimney | fires

less

Transcript and Presenter's Notes

Title: Chimney Fires


1
Chimney Fires
Instructor Bob Day NYS Certified Fire Instructor
2
Chimney Fires
  • Burns Explosively
  • Noisy, low rumble
  • Very high temps
  • Pyrolysis
  • Cracks in thimble
  • Cracks in flue pipe
  • Smoke damage
  • Roof Damage
  • Chimney Damage

3
Anatomy of a Chimney
4
More Anatomy
5
Damage Chimneys
  • 2000 deg melts masonry
  • Crack in Tile
  • Metal chimney hi heat can warped seams and crack

6
Response
  • Its only a chimney fire
  • Dont assume anything
  • THINK HOUSE FIRE!
  • Response as house fire
  • Full assignment
  • Pull charged line to front of house ready to go

7
Equipment needed
  • Chimney Brush
  • Tarps
  • Metal trash can
  • Heavy Chain with metal cable
  • D/C Extinguisher
  • Baggies with D/C
  • Small stove shovel
  • Booster line with chimney nozzle
  • TI Camera
  • Mirror

8
Assignments
  • Use ICS
  • Stove Crew
  • Roof/Chimney Crew
  • Ventilation Crew
  • Support crew
  • Accountability Officer
  • Safety Officer

9
Job Duties
  • Stove Crew
  • Put F/R tarps down
  • Open damper
  • Use DC to subdue fire
  • Remove combustibles in metal can
  • Remove Vent pipe if needed
  • Use D/C Extinguisher up chimney

10
Job Duties - Continued
  • Chimney/Roof Crew
  • Use Plastic bags with DC to put out fire
  • Use Booster line to extinguish fire with chimney
    nozzle

11
Job Duties
  • SUPPORT CREW
  • Remove debris from clean out
  • Check for extension along chimney area
  • Pull handline
  • Support ladders
  • Help with ventilation
  • Vacuum around stove area when done.

12
Safety
  • Full Protective Equipment for everyone
  • SCBA personnel working roof/chimney
  • Use TI camera and look for hot spots
  • Accountability
  • Use Radios for communications
  • Before use DC up stack communicate with personnel
    on roof/chimney

13
Termination
  • Check for hot spots
  • Fill out forms for Chimney fire for Inspector
  • Account for personnel
  • Tell home occupant not to use fireplace until
    inspection.

14
QUESTIONS????
BE SAFE EVERYONE GOES HOME
Write a Comment
User Comments (0)
About PowerShow.com