Title: Construction and Commsiioning Program Update


1
Small Business Opportunities John Robinson,
Manager Procurement Services April 29, 2009
1
2
Washington River Protection SolutionsWho Are We?
3
Richland Operations Office
Office of River Protection
Office of Science
www.hanford.gov/amh/
4
WRPS Scope
  • Retrieve waste from 149 older single-shell tanks
  • Transfer waste from the single-shell tanks to 28
    more durable double-shell tanks
  • Upgrade tank-farm facilities in preparation for
    waste feed to and from the Waste Treatment Plant
  • Develop supplemental technologies and facilities
    for treatment and disposal of low-activity waste

5
Recovery Act Workscope - Tank, Infrastructure,
Facility Upgrades
  • Tanks
  • Single-shell tank (SST) integrity and life
    extension
  • Double-shell tank (DST) upgrades and life
    extension
  • DST ventilation, electrical, control system,
    instrumentation upgrades
  • Infrastructure
  • Increased evaporator capability
  • Cross-site transfer line upgrade for slurry feed
  • Core sampling system
  • Facilities
  • 242-A Evaporator upgrades and life extension
  • 222-S Laboratory upgrades and life extension

6
Recovery Act Workscope - Waste Feed Treatment
Storage
  • Waste Feed
  • Design
  • In-Farm Field Work
  • Transfer and condensate line upgrades
  • Clean out boxes isolation
  • Support Facilities Construction
  • Tank waste mixing and sampling demo
  • Mixer pumps fabrication
  • WTP secondary waste treatment and Effluent
    Treatment Facility (ETF) upgrades
  • Design High-Level Waste Canister Storage/Shipping
    Facility

7
Recovery Act Subcontracting
  • Services
  • Temporary Staffing
  • Start-up and Testing
  • Specialized Design
  • Materials
  • Laboratory Equipment
  • Exhauster/ Exhauster Platforms
  • Waste Coring System
  • Booster/Transfer Pumps
  • Mobile Decon Trailers
  • Transfer Piping
  • Pressure Transmitters
  • Variable Frequency Drives
  • Valves
  • Construction
  • 222-S Roof Replacement
  • Storage Facility
  • Instrument, Control, Electrical Facilities
  • Install/Replace Transfer Lines
  • Isolate Clean Out Boxes
  • Central Control Facility
  • Mixer Pump Storage Facility
  • Mobile Office Trailer Installation
  • Pilot Scale Waste Characterization Facility

8
Small Business Subcontracting Goals
  • Subcontractors will follow and adhere to Company
    values and requirements
  • At least 15 of the contract work must be
    performed by small businesses.
  • A Small Business Subcontracting Plan that has the
    following minimum goals
  • 41.3 Small Business
  • 6.3 Small Disadvantaged Business
  • 5.8 Women-Owned Small Business
  • 2.2 HUBZone Small Business
  • 1.3 Veteran-Owned Small Business
  • 1.3 Service-Disabled Veteran Owned

9
WRPS Upcoming Opportunities
Other needs as they arise will be listed on our
website www.hanford.gov/chmpmm
10
Business Opportunities
  • Get Registered with WRPS. This is completely
    online and can be done at www.hanford.gov/chmpmm
  • Select Vendor Registration
  • Review current solicitations, expressions of
    interest, upcoming opportunities, events
  • Also, register at www.ccr.gov its FREE!
  • Contacts
  • Manager, Procurement Services
  • John Robinson
  • 509-373-3343 or John_M_Robinson_at_rl.gov
  • Small Business Program Manager
  • Melissa Garrard
  • 509-376-4871 or Melissa_Garrard_at_rl.gov

11
  • QUESTIONS???
  • Thank You