Institutional Strengthening of Environmental Inspectorates Kickoff Meeting, 23rd of January 2003 - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

Institutional Strengthening of Environmental Inspectorates Kickoff Meeting, 23rd of January 2003

Description:

Ingemarie Schmidt-Bens, PAA 'Institutional Strengthening of Environmental Inspectorates' ... 2003. 1. 1. Introduction of the PAA: Mrs. Ingemarie Schmidt-Bens ... – PowerPoint PPT presentation

Number of Views:68
Avg rating:3.0/5.0
Slides: 20
Provided by: rec109
Category:

less

Transcript and Presenter's Notes

Title: Institutional Strengthening of Environmental Inspectorates Kickoff Meeting, 23rd of January 2003


1
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
Overview of the Twinning Project Institutional
Strengthening of Environmental Inspectorates Ing
emarie Schmidt-Bens, PAA
2
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • 1.     1. Introduction of the PAA Mrs.
    Ingemarie Schmidt-Bens
  • Head of Division of Waste Management and
  • Deputy Head of Directorate of Waste Management
    and Soil
  • Protection in the Ministry for Environment of
    Schleswig-Holstein
  • Germany
  • special experience with regard to the Project
  •     modernizing re-organisation of
    administration
  •    working with staff on necessary changes
  •     optimising permitting procedures
  •     guide-lines of minimum criteria for
    inspections 2

3
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • PAA-Colleagues and
    Twinning Projects
  • Elisabeth Poncelet (F)
    Hazardous Waste D.
  • Maria Jacobsen (G) IPPC
    Directive
  • Jens Ulrik Jensen (D) Seveso
    II Directive
  • Dr. Stefan von Keitz (G) and
  • Pierre Henry de Villeneuve (F ) Water
    Framework D
  • Chris de Crane (B) Waste
    Management
  • Hartmut Behrend (G) Air
    Pollution Monit.

  • 2 a

4
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • Project Management Ms. Theresa Glasmacher, BS U
  • Tel.
    49-30-39042-62
  • Fax
    49-30-39042-47
  • PAA-Office Mrs. Ingemarie Schmidt-Bens, PAA
  • Mrs. Judit Borsos,
    Assistant
  • Ms. Luca Vendel-Mohay,
    Assistant
  • Tel. 36-1-346
    8333/8348/8356
  • Fax 36-1-315 0812


  • 2 b

5
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
2. Twinners are Partners Within the framework of
the EU Phare Program which finances Twinning
Projects the European Commission wishes to
promote the provision of national experts between
the national institutes of EU MS and those of
the CC. The purpose is to assist the CC to put in
place the institutions required to take on all
the Acquis Communautaire. Twinning means
Partnership between the MS - they give advice
and the CC they decide. That means, You, the
Hungarians, You are the decision makers!
But 3 Both work together as One Twinning
and Winning Team.
6
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • 3. Background of the Twinning Project
  • Organizational structures have changed after
    election.
  • Environmental Acquis means not only European
    legislation
  • but also integration. The idea is to reach the
    utmost of
  • integration between the various
    administrations.
  • Following those ideas it means integration for
    the whole
  • range from the Water Boards to the
    Environmental
  • Inspectorates to the Nature Conservation
    Directorates and
  • probably other administrations more in the
    near future.
  • This Project will certainly become a highly
    sensitive process.
  • The Team is aware of that and well
    prepared. - 4

7
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • 4. Objectives of the Twinning Project
  • The overall Objective
  • To assist Hungary in strengthening the capacity
    of its
  • environmental inspection system in order to
    give effect to the
  • EU Environmental Acquis Communautaire.
  • Permitting, licensing and compliance control in
    the field of
  • environment have to get integrated with each
    other in order to
  • meet the Acquis.
    5

8
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • The Key Objectives
  • to strengthen the institutional background,
  • to get permitting, licensing and compliance
    control in line
  • with the requirements of the EU environmental
    Acquis,
  • to ensure full institutional capacity to
    reporting and
  • information requirements of several main EU
    directives,
  • to provide training for 300 employees,
  • to ensure the consideration of the Aarhus
    Convention,
  • to implement the Minimum Criteria of Inspection
    (MCI),
  • to design a sustainable training system for
    future times. 6

9
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • 5. Components of the Twinning Project
  • Kick-off Meeting
  • Questionnaire Action
  • SWOT-Analysis
  • Future Institution
  • Improvement of Qualification of Staff
  • Data Management, Monitoring System and
    IT-Compatibility
  • Budgets of Inspectorates
  • Case Studies
  • Wrap-up Meeting Output of the Project
    7

10
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • How to Proceed the Process?
  • Questionnaire Action
  • SWOT-Analysis
  • Future Institution
  • Improvement of Qualification of Staff
  • Additional Activities
  • All the project needs is SUPPORT!
  • Ingemarie Schmidt-Bens, PAA

11
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • 1.Questionnaire Action
  • We all in Europe need to have comparable systems
    for permitting,
  • inspecting and monitoring procedures for
    environmental issues
  • therefore
  • You also have to adopt the Environmental Acquis
    Communautaire.
  • Some administrations will fulfil the EU
    requirements, others not yet.
  • We from Finland and Germany had to do the same
    efforts earlier.
  • Its up to us now to transfer our experience to
    you .
  • We give advice and you decide. Thats all.
  • But how to get to know, where you stay?
  • The best way is a Questionnaire.
  • They will be discussed on Workshops before
    delivered. 2P

12
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • 2. SWOT-Analysis
  • The answered Questionnaire will have to be
    analysed by
  • means of a SWOT-Analysis.
  • Strong and Weak points in relation to the
    requested
  • strengthening of the environmental
    inspection system - will
  • be identified in order to improve .
  • There will be SWOT-Analyses on
  • structures and responsibilities,
  • assignment of tasks and
  • number and qualification of staff.
    3P
  • The results of the SWOT will be discussed on
    Workshops.

13
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • 3. Future Institution
  • The Hungarian-Finnish-German Twinning Team will
  • elaborate proposals of how to strengthen the
    inspection
  • system based on
  • the Review of Hungarian Implementation and
  • Enforcement Procedures in the Environment
    Sector, the
  • AC-IMPEL Report of February 2001,
  • the EURENMEE Conception Report of 2000 and
  • the results of the SWOT-Analysis.
  • Proposals will be discussed by occasion of
    Workshops. 4P

14
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • 4. Improvement of Qualification of Staff
  • Preparation of Training
  • Identifying of 18 future core trainers,
  • Identifying of 300 employees (future trainers
    included),
  • Planning of training facilities,
  • Determining training contents taking into
    consideration
  • training within other Twinning projects,
  • Elaboration of assessment questionnaires,
  • Workshop .
    5P

15
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • Training on the following EU-Directives
  • Urban Waste Water Treatment (91/271/EEC),
  • Dangerous Substances in Water (80/68/EEC),
  • Large Combustion Plants (80/2001/EC),
  • Hazardous Waste Management (91/689/EEC),
  • Waste Management (75/442/EEC) and
  • Incineration of Hazardous Waste (76/2000/EC).

  • 6P

16
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • Study Tours
  • Study Tour No. 1 goes to Finland for 6 Hungarian
    future
  • trainers specialized on EU-Water Directives.
  • Study Tour No. 2 will lead 6 Hungarian future
    trainers to
  • Germany, in particular to Schleswig-Holstein
    and North-
  • Rhine-Westphalia to get informed on
    EU-Directives for
  • Hazardous Waste.
  • Study Tour No. 3 will be organized by Germany
    for 6
  • Hungarian future trainers on EU-Directives of
    Household
  • Waste and will take place in
    Schleswig-Holstein and
  • Hamburg.
    7P

17
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • Environmental Training Academy (ETA)
  • To ensure a continuous training on environmental
  • administration and to institutionalise
    training,
  • To keep staff on a high level of knowledge,
  • To introduce a long distance learning/training,
  • To prepare certificates for State
    Environmental
  • Inspector and Verified State Environmental
    Inspector
  • To elaborate procedures for the training in
    other subjects
  • than the mentioned EU-Directives,
  • Workshop.
    8P

18
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • 5. Additional Activities
  • Data Management, Monitoring System and
    IT-Compatibility
  • Budgets of Inspectorates
  • Case Studies
  • Workshop on Results Wrap-up Meeting


  • 9P

19
Institutional Strengthening of Environmental
InspectoratesKick-off Meeting, 23rd of January
2003
  • 6. All the Project needs is SUPPORT!
  • We need SUPPORT from you all the Ministries,
    the
  • Regional and Local Authorities, the
    PAA-Colleagues
  • and all those who are interested in a
    successful process!
  • We OFFER an excellent team of European experts
  • all our Hungarian Team members
  • 8 Finnish Short Term Experts and
  • 14 German Short Term Experts.

  • 10P