Title: LHCC Comprehensive review ALICE DCS


1
LHCC Comprehensive review ALICE DCS
  • 7 - 8 March 2005
  • L.JirdĂ©n

2
Outline
  • Context
  • Progress in 2004
  • Plans for 2005
  • Conclusion

3
Controls Context
1. Back-end
DCS
ITS
TPC
MUON
pixel
drift
strip
T
T
hv
p
hv
hv
hv
hv
lv
lv
lv
lv
lv
2. Detectors
4
1. DCS Back-end
5
Tools and Components Progress
  • PVSS
  • Important improvements on performance
  • Archiving now on Oracle
  • Scalability
  • No show-stoppers identified for PVSS
  • Guidelines on how to set-up large PVSS system to
    be completed
  • Performance tests started on full system
    including hardware
  • Framework ( 30 tools and components)
  • Fundamental redesign of core part achieved early
    04
  • Most of the essential items are ready

6
1. DCS Back-end
1st ALICE Back-end prototype ready
7
2. Detectors progress
done/usednot done/not used
8
2. Detectors progress
  • Common solutions
  • High Voltage Low Voltage
  • Basic solution for Wiener and CAEN devices exist
    some additions and changes are still required
  • Finite State Machine behavior developed and
    standardized
  • Front End Electronics
  • Prototype servers for SPD, TPC and TRD have been
    developed based on a generic device model (FED).
  • FEE configuration tools and database are being
    developed
  • General Purpose Monitor
  • A prototype is already surveying TPC chambers at
    P2..

9
2. Detectors progress examples
  • HMPID A full DCS prototype
  • 6 sub-systems with hierarchical control and FSMs
  • Interface to DAQ via ECS layer
  • Used in test-beams in 2004
  • TPC
  • 4 sub-systems with FSMs
  • Used in test-beam in 2004
  • SPD and TRD
  • 3 sub-systems
  • Used in test-beams in 2004

10
HMPID A full DCS prototype
11
TPC DCS test-beam Configuration May 04
FSM application
WXP, PVSS 3.0
T10 Control room
FSM application
FSM application
FSM application
WXP, PVSS 3.0
WXP, PVSS 3.0
WXP, PVSS 3.0
OPC client
OPC client
OPC client
ISEG OPC 2.09
WIENER OPC 1.06
ELMB OPC 2.04
C
PCI-CAN Peak
PCI-CAN Kvaser
PCI-CAN Kvaser
20m
ISEG
40m
30m
40m
130m
T10 beam area
Wiener
ELMB
5m
40m
DCS Ctrl
DDL
RCU
Chambers
Chambers
PT1000
High Voltage
Low Voltage
Temp. Monitor
FEE
12
3. Services electricity
13
3. Services GAS
  • 1st Prototype GAS Control System ready
  • Successful tests in B167
  • Ready for installation at Point 2
  • Preparation started for production of 7 more

Backup (plug)
Control rack
CO2 removal
Mixer
Purifier
Distribution
ethernet
Pump
Analysis
TPC GAS SYSTEM
14
3. Services SAFETY
  • Safety
  • Level 1 alarms
  • DCS interlocks alarms being defined
  • Level 2 alarms
  • DSS ready to be installed at Point 2
  • Level 3 alarms
  • CSAM back-end operational, sensors being defined

15
3. Other Services
  • Cooling
  • Front-end PLC prototype ready for HMPID SPD
    5 more left
  • PVSS Back-end development started
  • Magnets
  • L3 and Dipole prototype ready used during
    magnet tests in 2004
  • Infrastructure
  • B-field monitor prototype being developed
  • Space-frame deformation monitor requirements are
    being defined
  • Radiation monitors requirements are being
    defined
  • Network
  • For pre-installation 90 installed
  • For final installation being defined for UX

16
4. Interface to TRG, DAQ, HLT via ECS
  • Interface between DCS and ECS has been defined
  • A prototype for HMPID has been implemented and
    tested
  • A prototype for TPC is in preparation
  • Common online database studied

17
Plans for 2005
  • Performance tests of full prototype
  • To determine global system configuration
  • layout of the PVSS distributed system
  • the number of servers and FE computers

IN DCS LAB
18
Plans for 2005
  • TPC and HMPID Pre-installation at P2

NETWORK MARCH 05
19
Schedule Milestones
2007
HW infrastructure Back-end services Detector
sub-systems Integration with DAQ/TRG/HLT
20
Conclusion
  • All essential DCS components are available today
  • The Back-End system is prototyped
  • Each main detector has prototyped several of
    their sub-systems
  • All service applications follow schedule
  • Detector pre-installation planning fully
    respected by DCS