FCO Model Aeroporti di Roma ESUG, London 67 October 2005 - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

FCO Model Aeroporti di Roma ESUG, London 67 October 2005

Description:

To analyse the operational impact of current works in progress and many future ... We want to analyse all possible alternative solutions when part of the airport ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 15
Provided by: marco46
Category:

less

Transcript and Presenter's Notes

Title: FCO Model Aeroporti di Roma ESUG, London 67 October 2005


1
FCO ModelAeroporti di RomaESUG, London 6-7
October 2005
2
ADR and SIMMOD
  • ADR became a SIMMOD user Why?
  • To analyse the operational impact of current
    works in progress and many future construction
    works to be done at the airport during next five
    years
  • To accomplish infrastructure development as in
    FCO and CIA Master Plan (future runway capacity
    improvement, interaction between FCO and CIA
    airports, future traffic increase, environmental
    impact)
  • To work together with the Italian ATC Provider
    (ENAV) testing new solutions for the management
    of the whole air and ground airport system

3
ADR and SIMMOD
  • ADR became a SIMMOD user Why?
  • There are several works in progress and many
    construction works to be done at the airport
    during next five years
  • New gates construction
  • Runway re-surfacing
  • Taxiways renewal
  • New aircraft stands and taxiway system
  • New runway rapid exits
  • Structural and operational renewal of all
    runways

Current facilities renewal as well as new
airside/landside infrastructures
4
Runway Strip Pista 3
Double Bravo
Apron Sud-Est
Apron Echo
Pier C
Runway Strip RWY 1
5
ADR and SIMMOD
  • ADR became a SIMMOD user Objectives
  • We want to analyse with SIMMOD the impact of each
    work on the airport throughput and on the airport
    ground movements (delays, travel time, etc.)
  • We want to analyse all possible alternative
    solutions when part of the airport facilities
    will be closed due to renewal or construction
    works
  • Alternative taxi paths to be covered when part of
    the existing taxiway system will be closed for
    construction works
  • New gate assignment when some gates will be
    closed or unavailable as a consequence of
    construction works
  • New runway use when runway threshold will be
    displaced for construction works
  • Etc.

6
ADR and SIMMOD
  • ADR became a SIMMOD user Methodology
  • In order to study the impact of each construction
    work on the airport, we started building FCO
    Model
  • We started with the Baseline Scenario which has
    been calibrated on real data
  • We collected data to be used in SIMMOD like,
    traffic sample, timetable, runway use, 2004
    traffic distribution, etc.
  • We will keep FCO Model as Baseline Scenario for
    future studies to be performed as comparison
    against Baseline

7
ADR and SIMMOD
  • ADR became a SIMMOD user Methodology
  • We decided to divide each work in different
    phases
  • For example, double taxiway Bravo is divided into
    9 phases
  • Each phase is analysed as a single SIMMOD
    scenario
  • Results such as runway throughput, ground delays,
    ground movements, are recorded for each phase
  • Different solutions are taken into account, and
    the best are used during critical periods due to
    construction works

8
ADR and SIMMOD
  • Fast-Time simulation scenarios
  • Double Bravo first phases
  • Double Bravo and New Pier C working phases
    (overlap)
  • FCO Master Plan
  • Example of Fast-time simulation results
  • Following there is an example of the type of
    results we are looking at

9
Double Bravo, Phase n.5 Pier C, Phase
n.3Analysis of the impact on ground movements
New South-East gates
10
Example of Results
11
Example of Results
Difference 2.78 min
Difference2.4 min
12
FCO Master Plan 2015
60 more traffic new runway use New gates
New Piers Complete Double Bravo New
Multi Alliance Terminal distribution
FCO Master Plan is under approval
13
  • ENAV, the Italian service provider, has designed
    and validated with SIMMOD new runway use in order
    to increase airspace capacity
  • We have introduced these new procedures in the
    FCO Master Plan fast-time simulations since,
    together with the new FCO terminal assignment
    strategy, which is Multi Alliance Hub oriented,
    represent future airport scenarios
  • New departure and approach procedures have been
    designed to manage departure peaks along the day
    as well as to use parallel runways as independent
    and increase capacity
  • ENAV airspace strategy couples with ADR ground
    strategy which aims at an airport division
    through the new Multi Alliance terminal
    assignment
  • FCO will have like two separate airports

14
(No Transcript)
Write a Comment