LAUNCH VEHICLE DOWNSELECT - PowerPoint PPT Presentation

About This Presentation
Title:

LAUNCH VEHICLE DOWNSELECT

Description:

3) Usable Volume of Largest Fairing. 4) Cost. 5) Payload Capability To LEO ... bisector fairing. graphite epoxy foam core. composite sandwich structure ... – PowerPoint PPT presentation

Number of Views:56
Avg rating:3.0/5.0
Slides: 17
Provided by: angel54
Category:

less

Transcript and Presenter's Notes

Title: LAUNCH VEHICLE DOWNSELECT


1
LAUNCH VEHICLE DOWNSELECT
  • A Wide Variety of Launch Systems Are Available
    Today
  • Initial Downselect Constraint Based Upon UMRM
    Requirements
  • Primary Payload Size
  • TOF Concerns
  • Initial Downselect Constraint
  • Launch Vehicle Should Be Capable of Lifting At
    Least
  • 10,000 kg into LEO

2
LAUNCH VEHICLE DOWNSELECT
Six Expendable Vehicles
Ariane 5
Atlas V
Delta IV
Zenit
Proton
Titan IV
3
LAUNCH VEHICLE DOWNSELECT
  • EVALUATION CRITERIA
  • 1) Reliability
  • Vehicle Success Rate
  • Family Success Rate
  • 2) Launch Inclination Availability
  • 3) Usable Volume of Largest Fairing
  • 4) Cost
  • 5) Payload Capability To LEO

4
LAUNCH VEHICLE DOWNSELECT
5
LAUNCH VEHICLE DOWNSELECT
6
LAUNCH VEHICLE DOWNSELECT
7
LAUNCH VEHICLE DOWNSELECT
8
LAUNCH VEHICLE DOWNSELECT
9
LAUNCH VEHICLE DOWNSELECT
10
LAUNCH VEHICLE DOWNSELECT
PRIMARY LAUNCH SYSTEMS
Delta IV-Heavy
Atlas V-552
11
LAUNCH VEHICLE CONFIGURATION
ATLAS V-552
12
LAUNCH VEHICLE CONFIGURATION
ATLAS V-552
  • LONG COMPOSITE FAIRING
  • 5 m diameter by 23.4 m
  • bisector fairing
  • graphite epoxy face sheets
  • aluminum honeycomb core

13
LAUNCH VEHICLE CONFIGURATION
ATLAS V-552
  • TYPE D PAYLOAD ADAPTER
  • Marmon-type clampband separation system
  • Requires special payload interface adapter to be
    manufactured
  • Hardware adapter will attach to the main tank
    aft structure,
  • surrounding the 7 MITEE engines
  • Must jettison adapter prior to spacecrafts
    initial burn

14
LAUNCH VEHICLE CONFIGURATION
DELTA IV-HEAVY
15
LAUNCH VEHICLE CONFIGURATION
DELTA IV-HEAVY
  • COMPOSITE FAIRING
  • 5 m diameter by 19.1m
  • bisector fairing
  • graphite epoxy foam core
  • composite sandwich structure

16
LAUNCH VEHICLE CONFIGURATION
DELTA IV-HEAVY
  • Delta IV 1666-5 PAF
  • Marmon-type clampband separation system
  • Aft structure of each add-on tank will be
    designed to accommodate this
  • connection interface
Write a Comment
User Comments (0)
About PowerShow.com