Snorre B: Use of Measurements - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

Snorre B: Use of Measurements

Description:

Zonal Rates Estimation ... Zonal Rates Estimation. 14. Snorre DIACS Producer Wells Follow-Up ... Zonal rate estimation. Voidage follow-up at reservoir level ... – PowerPoint PPT presentation

Number of Views:150
Avg rating:3.0/5.0
Slides: 19
Provided by: kulkarn
Category:

less

Transcript and Presenter's Notes

Title: Snorre B: Use of Measurements


1
Snorre B Use of Measurements
  • Raghu Kulkarni
  • Statoil

2
Statfjord
Gullfaks
Visund
Snorre reservoir 2,5 km below sealevel
BCU
3
Outline
  • Snorre B background information
  • How we use the data/measurements on Snorre B
  • Examples of benefit

4
Snorre B
SNB
5
Snorre B Status
  • 7 producers, 4 smart and 3 conventional
    completions
  • 5 injectors, all 5 are smart completions
  • Real time data per sleeve PT on annulus and
    tubing side, sleeve opening
  • 34 sleeves with 5 sensors per sleeve
  • 12 wells, but monitoring challenge equal to that
    of 37 wells

6
Outcrop, Escanilla Fm. Spain
7
Snorre B Reservoir Management Challenges
  • Several reservoir zones
  • varying reservoir quality
  • WAG injection
  • Production/sweep Optimization
  • Early gas, water breakthrough in some layers

Based on SNB experience so far, all future wells
on SNB will have DIACS as primary completion.
8
Well D-6H
Isolation packers
SN 5
SN 4
SN 3
SN 2
Wellpath
OWC
SN 2
SN 3
SN 4
SN 1
9
Slide 1/9
Snorre Production Monitoring DP Technique on D-6
10
DT Monitoring
  • DT monitoring provides indications of free gas
    breakthrough
  • gas leads to lower specific heat
  • higher turbulance
  • more temperature loss
  • lower pressure loss
  • DT response on sleeve level not easy to interpret

11
Gas Breakthrough D-4
Free gas breakthrough in sleeve 2.
DT monitoring indicative of changes in reservoir,
and sensitive to gas.
12
Zonal Rates Estimation
  • Can we estimate individual zone rates given dp
    values and total liquid or gas rate in single
    phase producers and injectors
  • External program which modifies rates from each
    sink/source term until all pressures and rate
    data from tests matched

13
Zonal Rates Estimation
14
Snorre DIACS Producer Wells Follow-Up
  • Production/Injection at well level allocated to
    sleeve level based on zonal rates estimation
    technique
  • Sleeve level production allocated to reservoir
    level based on Kh product

15
Snorre DIACS Injectors follow-up
Imagine the case if only total wellrate was known
..Ignorance is bliss!!
16
Voidage
  • Voidage is the balance on reservoir volume
    (injection, production in Rm3)
  • On SNB voidage can be done on reservoir level

17
Analysis to Action
  • Extra 600 Sm3/d in D-4 for 103 days
  • Extra 1000 Sm3/d in C-5 and 800 Sm3/d in C-6 for
    119 days

18
Summary
  • The downhole measurements are key to the advanced
    reservoir management on Snorre B
  • DIACS together with the measurements allow
  • Zonal rate estimation
  • Voidage follow-up at reservoir level
  • Voidage follow-up at reservoir level is the basis
    for DIACS sleeve operations and improved recovary
    on Snorre B
Write a Comment
User Comments (0)
About PowerShow.com