Wastewater Treatment and Reuse in Lebanon: Key Policies and Future Scenarios - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Wastewater Treatment and Reuse in Lebanon: Key Policies and Future Scenarios

Description:

1998 MCM with ameliorated Efficiencies (80% for potable water and 75% for irrigation ) ... Beirut region suffer from lack on potable water and to fill up this ... – PowerPoint PPT presentation

Number of Views:242
Avg rating:3.0/5.0
Slides: 11
Provided by: kka6
Category:

less

Transcript and Presenter's Notes

Title: Wastewater Treatment and Reuse in Lebanon: Key Policies and Future Scenarios


1
Wastewater Treatment and Reuse in Lebanon Key
Policies and Future Scenarios
  • K. Karaa, F. Karam and N. Tarabey

WASAMED Workshop, Cairo 7-11 December 2004
2
Necessity for non Conventional water use in
Lebanon
  • Total Available Water Resources in Lebanon2000
    MCM
  • Total Needs in 2020
  • 2450 MCM with actual Efficiencies Networks
  • 1998 MCM with ameliorated Efficiencies (80 for
    potable water and 75 for irrigation )
  • Lebanon must search for new non conventional
    water resources

3
Non Conventional Water Resources
  • Drainage water collection
  • Flooding area in the Bekaa Valley (5000 ha)
  • Actually Drainage system is active and collected
    water is recuperated in the Litani river bed and
    stocked in Qaraaoun Reservoir
  • Works for Recalibration and rehabilitation of
    Litani River and Effluents are ongoing.
  • Coastal plain area where gravity irrigation
    technique is practiced
  • Diminution of drainage water volume by using
    adequate irrigation techniques
  • Water drainage reuse at on-farm level with a
    regular water quality monitoring
  • Gained volumes are insignificants compared to
    needs

4
Non Conventional Water Resources
  • Sea water desalination Seems to be very costly
    to Lebanon according to actual cost 0.5 to 0.6
    US by Cubic Meter
  • Conclusion Treated Waste Water is a god solution
    to assure new water resources

5
Waste water treatment plan
  • A master plan for secondary waste water treatment
    is already elaborated for all Lebanon and Funded
    at 70.47 of total Cost.
  • Between 2005 and 2007, constructed plants are
    previewed to serve until 2015, 88 of the total
    Lebanese population.

6
  • Topographical, demographic and urban conditions
  • Economical considerations
  • Incite to preview a master plan where the major
    part of waste water (55) is collected on the
    coastal area.

Master plan for waste water treatment in Lebanon
7
(No Transcript)
8

Lebanon Land Form and Plain Areas
9
Treated waste water reuseBeirut region
  • - 36 of treated waste water is generated by
    Beirut Treatment Plants (Dora Ghadir) where
    agricultural activity is very limited (green
    houses) and is invested regularly and very fast
    by urban activities
  • Beirut region suffer from lack on potable water
    and to fill up this lack about 3000 wells are
    drilled.
  • Underground water suffer from salinity problems
  • Main treated wastewater volume in Beirut region,
    can be used to control sea water intrusion

10
Treated waste water reuseOthers Coastal areas
and Inland Regions
  • Treated water can be entirely used for
    agriculture purposes
  • This use is a water quality matter which to be
    adapted with Lebanese legislation.
Write a Comment
User Comments (0)
About PowerShow.com