Title: Calibration Status for Current Instruments and Plans for Future Instruments: AVHRR, Landsat, MODIS, VIIRS, APS, ABI
1Calibration Status for Current Instruments and
Plans for Future Instruments AVHRR, Landsat,
MODIS, VIIRS, APS, ABI
- B. Guenther1 and Brian Markham2
- 1 University of Maryland, Baltimore County
Goddard Earth Science and Technology Center
bruce.guenther_at_gsfc.nasa.gov - 2 NASAs Goddard Space Flight Center, Mail Code
614.4, Greenbelt, MD 20771
2AVHRR
Band No. NOAA 6, 8, 10 NOAA 7, 9, 11, 12, 14 NOAA 15, 16, 17, 18
1 0.58 - 0.68 0.58 - 0.68 0.58 - 0.68
2 0.725 - 1.10 0.725 - 1.10 0.725 - 1.10
3 1.58 - 1.64
Wavelength in micrometers Wavelength in micrometers Wavelength in micrometers
Ascending Node 1340 (11), 1400/1420/1430 (7, 9, 14, 16, 18), 1930 (6, 8, 10, 15), 2200 (17) Ascending Node 1340 (11), 1400/1420/1430 (7, 9, 14, 16, 18), 1930 (6, 8, 10, 15), 2200 (17) Ascending Node 1340 (11), 1400/1420/1430 (7, 9, 14, 16, 18), 1930 (6, 8, 10, 15), 2200 (17) Ascending Node 1340 (11), 1400/1420/1430 (7, 9, 14, 16, 18), 1930 (6, 8, 10, 15), 2200 (17)
- Climate Applications
- Vegetation Indices
- ISCCP (cloud) products
- Primary Calibration Strategy
- Prelaunch
- Vicarious on-orbit
3Landsat MSSLandsat-1 1972-1978 Landsat-2
1975-1982 Landsat-3 1978-1983 Landsat-4
1982-1992 Landsat-5 1984-1992
4 VNIR Bands - 80 meters 185 km swath 18 day
repeat cycle (Landsat 1-3) 16 day repeat cycle
(Landsat 4-5) 0850-0945 equatorial crossing
- Climate Applications
- Regional land cover land use change carbon
consequences - Regional biomass change carbon consequences
- Primary Calibration Strategy
- Internal lamps on scene-by-scene basis
4Landsat TM/ETM Landsat-4 TM (1982-3
1987-1993), Landsat-5 TM (1984-gt), Landsat-7 ETM
(1999-gt)
4 VNIR 2 SWIR bands -- 30 m
1 Panchromatic - (ETM) -- 15 m 1 TIR -- 60
m (ETM) 120 m (TM) 0945-1000 equatorial
crossing 185 km swath 16-day repeat
L7- seasonal global
cloud-free coverage
- Climate Applications
- Regional land cover land use change carbon
consequences - Regional biomass change carbon consequences
- Primary Calibration Strategy
- L4/L5 TM
- Initial Internal lamps on scene-by-scene basis
- Current L5 TM Reconstructed history based on
lamps, vicarious, outgassing model and ETM Xcal
5/2003 -gt - L7 ETM
- Pre-launch calibration monitored by on-board
lamps, diffuser and vicarious calibration
SLC failure May 2003
5LDCM Sensor(s)
Based on draft documents on LDCM website 5/06,
subject to change
5 VNIR bands - 30 m 3 SWIR bands including cirrus
detection band - 30 m 1 Panchromatic band - 15
m Possible thermal band option
- Climate Applications
- Regional land cover land use change carbon
consequences - Regional biomass change carbon consequences
- Primary Calibration Strategy
- Internal Lamps
- Lunar views
- Solar diffuser
6Landsat Climate Change Applications
- Land Cover Land Use Change (LCLUC) studies
- Forest Biomass and Land-Use Change in Central
Africa Reducing Regional Carbon Cycle
Uncertainty - Comparative Studies on Carbon Dynamics in
Disturbed Forest Ecosystems Eastern Russia and
Northeastern China - http//lcluc.umd.edu
- Landsat Ecosystem Disturbance Adaptive
Processing System (LEDAPS) - North Americans forest disturbance and surface
reflectance mapping using Landsat data for North
American Carbon Program - http//ledaps.nascom.nasa.gov/ledaps/ledaps_NorthA
merica.html
- National Carbon Accounting System (NCAS)
- comprehensive picture of land cover change over
the Australian continent for the past 30 years
using Landsat data. - http//www.greenhouse.gov.au/ncas/activities/landc
over.html
- Statewide Landcover and Trees Study (SLATS)
- Monitoring land cover change and greenhouse gas
emissions in Queensland, AU - http//www.nrm.qld.gov.au/slats/index.html
7Landsat-7 ETM VIS/NIR Calibration Strategy
- Calibration Working Group
- NASA
- USGS
- 2 University Vicarious Calibration Teams
- 2 thermal band vicarious calibration teams
- Twice Yearly meetings
- Radiometric Calibration Hardware
- Internal lamps --every scan
- Primary - 99.9 of scenes
- Secondary - 0.1 of scenes
- Solar diffuser - Full Aperture Solar Calibrator -
monthly - Partial Aperture Solar Calibrator-daily
8MODIS
- Climate Applications
- Advances CZCS and AVHRR
- nLw, Chlor_a, aerosols, clouds, H2O vapor,
vegetation indices, snow/ice, land cover/dynamics
- Primary Calibration Strategy
- Full aperture Solar Diffuser with SDSM
- Spectro-radiometric calibration assembly for
spatial and spectral partial aperture
characterization - Lunar
- Vicarious techniques
9VIIRS for NPOESS
- Climate Applications
- Build on MODIS data set heritage
- Primary Calibration Strategy
- Spectralon Solar Diffuser (100 Earthshine
rejection) - Solar Diffuser Stability Monitor (8 bands)
- Lunar observations
10Aerosol Polarimeter SensorShown is the RSP
- Coverage
- Polarimetry and radiometry between 400 and 2300
nm - Along track scanning, narrow swath
- A-train position
- Primary Calibration Strategy
- On-orbit calibration approaches
- Data Heritage
- Research Scanning Polarimeter, POLDER, MODIS, Sun
Photometer network EOSP
- APS Science Requirements
- Aerosol refractive index, single scattering
albedo, and shape - Aerosol optical thickness
- Aerosol particle size
11Advanced Baseline Imager for GOES-R
- 6 Spectral Bands, resolution of 0.5 to 2 km
- Full disk or CONUS in 5 min, 30 s mesoscale
images
- Primary Calibration Strategy
- On-orbit, sun-activated target
- Proposed special target, Swales development
(Bremmer)
- Climate Applications
- Aerosols, vegetation, clouds ( thin cirrus),
fire/burn scar detection, snow/ice