Implementation of AMR and its Application in Outage Management PPL Electric Utilities Corp - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

Implementation of AMR and its Application in Outage Management PPL Electric Utilities Corp

Description:

Implementation of AMR and its Application in Outage Management. PPL Electric Utilities Corp ... Improved power outage detection and restoration process ... – PowerPoint PPT presentation

Number of Views:259
Avg rating:3.0/5.0
Slides: 22
Provided by: mpie8
Category:

less

Transcript and Presenter's Notes

Title: Implementation of AMR and its Application in Outage Management PPL Electric Utilities Corp


1
Implementation of AMR and its Application in
Outage ManagementPPL Electric Utilities Corp
  • Michael S Godorov
  • Manager - AMR Operations
  • June 2, 2005

2
Introduction
  • Overview
  • Project Mission
  • Project Description
  • AMR Technologies
  • How Did We Do?
  • Benefits
  • Outage Verification
  • Conclusion

3
Overview
  • PPL Electric Utilities
  • regulated electricity gas subsidiary of PPL
    Corp
  • Annual revenues assets of PPL Corp.
  • 5.8 billion 17.7 billion, respectively
  • Serves 1.35 million customers over 10,000 square
    miles in Central Eastern Pennsylvania

1
4
PPL Electric Utilities
  • Central and eastern Pennsylvania
  • 10,000 square miles
  • 1.35 million customers
  • 680 million TD revenue
  • 7,500 MW peak load
  • 35.9 billion kwh delivered
  • 2,200 employees

5
Project Mission
  • Establish best metering automation plan
  • address 3 major challenges
  • increasing costs
  • retail market deregulation
  • unbundling revenue cycle services
  • Challenge - establish as strategic enabling
    initiative, not just a meter reading solution
  • How to accomplish
  • establish a cross functional project team
  • complete within less than 3 years from first
    meter exchanged
  • assure near term gains would be secured
  • investigate future benefits from AMI
    implementation

1
6
Project Description
  • Established AMI project plan
  • 5 phases
  • detailed interviews
  • detailed internal cost benefit analysis
  • characterized best value proposition
  • rigorous SST, plan to support implementation
  • deploy meters, SCEs and cellular gateways
  • Justification
  • comprehensive economic analysis
  • payback approximately 5 years
  • Goals
  • achieve benefits
  • implement on budget and schedule
  • explore future benefit opportunities

1
7
AMR Technology - PLC
Power Line Communications (PLC)
Communications Server
Billing system
Distribution Substation
Telecommunications Link
PPL Net
PPL Workstations (PC)
Substation Control Equipment
PPL TD Management Systems
Power Lines
Meter Retrofitted with Module
ServiceTo Home
8
AMR Technology - CDMA
Code-Division Multiple Access (CDMA) Solution
provided by Comverge
PowerCAMP
Telecommunications Link
CSS
PPL Net
Client Workstations (PC)
Meters equipped with Cellular Radios
Existing Cellular Transmitter (Public Network)
Energy Management, Outage Management Systems
9
How did we do?
  • Goals
  • project delivered in less time than expected
  • benefits realized and completed within budget
  • Implementation
  • largest AMI system 2-3 years
  • deployed using IBEW and contractor workforce
  • highest average daily exchange rate - 4200 meters
  • 313 DCSI TWACS SCEs in 1-1/2 years

1
10
Benefits
  • Significantly eliminated estimated bills
  • Ability to access difficult-to-read meters
  • Reduced trips to field (connect/disconnect read)
  • Improved power outage detection and restoration
    process
  • Resolve Billing Disputes on telephone via
    on-demand requests for meter reading information
  • More timely bills
  • Improved access and information on energy
    consumption to resolve high bill complaints
  • Enhanced customer satisfaction
  • Reduction in safety exposure

11
Outage Verification
  • Reliability
  • Outage verification
  • application of PLC application
  • hierarchical view of feeders, devices from a
    substation
  • Enables circuit monitoring
  • use of blink count
  • identify potential neutral and phase issues on
    circuit

12
Outage Verification
  • During Hurricane Isabel, PPL used AMR to aid in
    the restoration process by sending electronic
    signals to the AMR meter to verify that customers
    had service.
  • the use of the AMR system allowed us to more
    thoroughly analyze outage locations and help
    dispatchers to direct crews more effectively.
  • personnel entered transformer grid numbers into a
    web based application and pinged the meters
    associated to the transformer grid.
  • within less than a minute users were able to view
    the status of communications with the meters to
    verify power to the meter
  • Today, we use this functionality to aid
    restoration
  • single no-light calls storm-related outages
  • more automated

13
Outage Verification
AWSEM Ping Tool
14
Outage Verification
AWSEM Ping Tool
15
Outage Verification
AWSEM Ping Tool
16
Outage Verification
AWSEM Ping Tool
17
Outage Verification
AWSEM Ping Tool
18
Outage Verification
  • Additional needs of an Outage assessment tool
  • ping meters with fewer commands
  • recognize extent of system problems
  • improve service restoration monitoring
  • proactive identification of service issues

19
Outage Verification
Group addressing
Ping more meters with less commands
  • Allows us to ping up to 64 meters with one
    command
  • Less commands for TNS to process

20
Outage Verification
OASys Outage Application
21
Conclusion
  • We are meeting the requirements of the business
    case
  • Improved our credibility with customers
  • Overall, we are a better company with this
    solution
  • For more information contact
  • Mike Godorov at PPL 484.634.3277
  • msgodorov_at_pplweb.com

1