Title: CALIPSO Commissioning Status


1
CALIPSO Commissioning Status
Carl Weimer, Lyle Ruppert, Justin Spelman Ball
Aerospace Technologies Corp.
2
CALIPSO Satellite is Operational On-Orbit
CALIOP Lidar First Light
3
Wide Field Camera
4
(No Transcript)
5
On-Orbit Program Structure
  • Principal Investigator is Dave Winker PI, co-PIs
    Jacque Pelon and Patrick McCormick Payload
    Project Manager Kevin Brown
  • Satellite Operation Command Center (SOCC) is
    operated by CNES out of Toulouse
  • Mission Operation Command Center (MOCC) is
    operated by NASA LaRC out of VA
  • Ball is a partner for Payload operations
  • ASDC handling science data is at LaRC
  • Calibration/Validation Campaign coordinated out
    of Hampton University
  • Includes a Quid Pro Quo sharing of data between
    different ground and airborne systems with
    CALIPSO program
  • NASA LaRC has started flying its airborne High
    Spectral Resolution Lidar for validation studies

6
Commissioning Progress on Platform
  • Alcatel Proteus Spacecraft is fully operational
  • Survival Heaters functioning properly to protect
    Payload
  • Lithium Batteries are performing well (new to
    LEO)
  • S-Band communication system for Command and
    Telemetry is functional (Kiruna)
  • Hydrazine Propulsion system is functional and has
    been used
  • Power System is nominal Currently 34 V to 36 V
    over an orbit solar array mechanisms nominal
  • Nadir Pointing control held to required 0.08
    degrees, achieving 600 m control on ground.
  • Orbit Corrections complete, CALIPSO is in the
    A-Train as of May 31
  • Gyro Calibration Complete Series of off-nadir
    rotations made, science data was collected to
    study ocean lidar return
  • GPS and Attitude (from Startrackers) Bulletins
    being provided to Payload for data geolocation
  • Spacecraft commissioning is complete

7
Commissioning Progress on Payload
  • Ball/NASA Payload is fully operational
  • Baseline plan of 45 days was met. Included
    extended period of outgassing and being powered
    off for spacecraft health checks and orbit
    correction maneuvers
  • Sequential approach was used to bring up each
    subsystem and verify its functionality
  • All subsystems powered up properly, power use
    agrees with predictions for each with minor
    variances
  • Thermal performance of subsystems has agreed well
    with pre-launch models.
  • Good thermal stability can be achieved within a
    day of powering off/on. Safe to Data Acquisition
    in 3 orbits.
  • Laser thermal balancing completed on June 9

8
Different Views of Payload
Wide Field Camera BATC CT-633
X-Band Antenna
Sun Shade
Star Tracker Assembly - French
X-Band Transmitter
Payload Controller
Laser Electronics Unit - Fibertek
Imaging Infrared Radiometer -Sodern
Integrated Lidar Transmitter - Fibertek lasers
Lidar Receiver Electronics
Receiver Power Supply
9
Lidar Core Transmitter and Receiver
Adjustable Boresight Mechanism
APD
PMTs - LaRC
Laser Radiator
Optical Bench
Laser Optics Modules
Telescope
Beam Expander Optics
ILT (Integrated Lidar Transmitter)
ILR (Integrated Lidar Receiver)
10
Lidar Transmitter
  • Two redundant NdYAG lasers each capable of full
    mission life
  • 110mJ at both 532nm and 1063 nm _at_ 20 Hz
  • Lasers were delivered by Fibertek in 2002. Total
    of 80 million shots (4 of mission) fired during
    IT
  • Laser has been operational since May 23,
  • 27 million shots on-orbit as of June 23
  • Conductively cooled, thermal performance has been
    excellent slight shift in operating points from
    those on ground indicating subtle thermal effects
  • O-ring sealed pressure decay on units
    observable but meeting lifetime requirements
  • Following data shows energy stability starting on
    June 9 (last heater adjust) through June 21

11
Laser Pulse Energy
12
Lidar Receiver - Detectors
  • Photomultipliers (Parallel/Perpendicular 532 nm
    ) and Avalanche Photodiode (1064 nm) are healthy
  • High Voltage power supplies showing excellent
    stability lt0.1 over an orbit
  • Built in Test System (using LEDs) has verified
    sensitivity and timing response
  • Signal levels from Rayleigh are slightly higher
    than predicted based on radiometric math models
    of instrument
  • Detector noise levels pass requirements (outside
    of South Atlantic Anomaly)
  • Background light measurement made in high
    altitude regions is used to remove offset for
    each shot. Agrees with performance on ground.

13
Etalon
  • 532 nm channel uses an etalon to limit bandwidth
    in order to reduce daytime background light
  • Etalon bandwidth is matched to laser linewidth
    0.035 nm 35 pm 37 GHz
  • Finesse of 18
  • Etalon is a fixed, match-polished sandwich
    style made by Coronado, in a Ball mount.
  • Angle tuned and locked into place on bench.
    Temperature tunable over one linewidth on-orbit
  • On-orbit performance agrees with ground
    performance for both center wavelength and
    linewidth.
  • Uses main 532 nm lidar signal from
    upper-atmosphere to produce a steady signal to
    allow etalon to be tested

14
Etalon Spectral Tuning Raw Data
15
Lidar Receiver - Data Processing
  • Onboard Data Processing of lidar data is
    functioning properly
  • Merge and Scale dual ADCs for each channel to
    achieve 23 bit dynamic range
  • Remove offsets and baselines (if needed)
  • Aligns all range bins then performs vertical
    and horizontal averaging to reduce data volume
  • Calculates a reduced data set to downlink on
    S-band
  • Attaches all header information on a shot-to-shot
    basis e.g. laser shot energy, pierce point
    lat/long, range to mean sea level, etc.
  • Achieves a lidar data compression of a factor of
    25
  • Requires high-performance rad-tolerant computer
  • First Flight of General Dynamics PC603 running at
    160 MHz utilizing direct memory access and quad
    processors
  • Extensive Error Detection and Correction (EDAC)
    Algorithms are keeping up with radiation induced
    upsets, 5/day.
  • Memory testing shows no problems due to radiation
    or weak bits

16
Lidar Receiver- Science Data Handling
  • Lidar Data is merged with the WFC and IIR data
  • Science Data
  • Stored in a 48 Gbit solid state recorder on
    Payload
  • Downlinked to Alaska (backup in Hawaii) over an
    X-band link once per day
  • United Space Networks receives and processes
    before shipping to NASA
  • Achieving gt99 data throughput on X-band
  • 4.8 GByte/ Day delivered to NASA with 24 hour
    latency looking into reducing this.
  • NASA ASDC is generating Level 1 with 24 hour
    latency
  • Command and Telemetry Data
  • Commands uplinked up to 6 times/day during
    commissioning (during normal ops, this has to be
    scheduled)
  • Stored on Platform
  • Downlinked on S-band to Kiruna
  • Delivered to LaRC with latency 30-45 minutes

17
Lidar Transmitter/Receiver Alignment
  • Active Boresight Mechanism allows the lidar
    overlap function to be adjusted on-orbit
  • Goal is to use once to correct for shifts due to
    launch, thermal, humidity, and 1-g effects
  • Extensive testing on ground prior to launch
    including two full atmospheric tests
  • Adjusts pointing based on main lidar signal
    strength
  • On-Orbit - autonomous search algorithm succeeded
    in 4 minutes (requirement lt 24 hours) fine align
    succeeded in 10 minutes (requirement lt 20
    minutes)
  • Alignment repeated multiple orbits to verify
    performance results agreed within limits of
    algorithm approximately 7 microrads within
    requirements
  • More stability testing may be done later to look
    at different orbit times (different temperature
    gradients)

18
Lidar Polarization Testing Preliminary
  • Photomultiplier tubes are collecting
    cross-polarized data at 532 nm
  • Primary objective is to distinguish water from
    ice clouds
  • Required extensive polarization design, testing
    and alignment of full system
  • Wedged quartz depolarizer mounted on a mechanism
    can be inserted into beam to calibrate the two
    channels
  • Residual instrument polarization effects lt 0.7,
    measured using Clear- Air depolarization from
    stratospheric Rayleigh scattering (25-35 km)
  • Depolarizer gain calibration has shown to be good
    to lt 2 independent of scene the lidar is seeing
  • Final polarization characterization will be
    reported in future by Chris Hostetler (NASA LaRC)

19
Summary
  • CALIPSO is up and running and in the science
    assessment phase
  • All subsystems are operating nominally
  • Design and performance information on CALIPSO is
    available from Ball to support Wind Lidar trades
    and development
  • See attached additional Lidar First Light
    images from Dave Winker
  • Acknowledgments Thanks for Inputs from
  • Dave Winker, Bill Luck, Bill Hunt, Mike
    Cisewski, Dave Rosenbaum, Alan Little, Rob
    DeCoursey, Dave MacDonnell, Ron VerHappen, from
    NASA
  • Ryan Melton, Mike Wallner, Jim Leitch, Brian
    Johnson, and Leela Hill from Ball